Waterfall Islands
Stone Work · Miami & South Florida
Illustrative design study
Stone falling to the floor on both ends, grain running true around the corner — the mitered detail done right.
What we coordinate
- Mitered waterfall edges
- Bookmatched slab layouts
- Integrated seating overhangs
Stone & finishes
- Marble, quartzite, porcelain
- Steel substructures
Where it belongs
- Kitchens
- Bars
- Reception desks
Stone and millwork, coordinated
Template & supports
Coordinate the measured dimensions, substrate and support requirements with the millwork and project team.
Slab & detail review
Review the selected material, edge profiles, seams, cutouts and transitions before fabrication proceeds.
Fabrication coordination
Coordinate stone fabrication with the approved details and the cabinetry or millwork it meets.
Installation interfaces
Sequence the installation and review the joints, reveals and finished transitions between stone, wood and adjacent surfaces.
Questions
Does the veining wrap the corner?
With proper miter layout, yes — we dry-lay and photograph slabs for approval before cutting.
